The Every Eval Ever datastore records scores for about 11,700 models on about 8,400 metrics, but only 0.4% of model–metric pairs have a measured score. This page estimates the unmeasured scores and reports how accurate the estimates are on held-out data. It combines two estimators: low-rank matrix completion of the score matrix, and nearest-neighbor regression in the Product Kernel Perspective Space (PKPS; Helm et al., 2026) for the 148 models whose item-level responses are in the store. Models, benchmarks and metrics are named as in the Evaluation Cards. Each estimate has a 90% interval calibrated on held-out scores.
By benchmark: choose a collection and a metric to list the models on it. Each measured score is shown with its held-out estimate, the value estimated for it in cross-validation when all of that model's scores in the collection were hidden. By model: choose a model and a collection to list its measured and estimated scores. Selecting an estimate for an unmeasured score shows its components. Selecting a measured score opens its source record.
Each estimate is for one setup. A collection is one reporting organisation's setup: its harness, prompts, reasoning settings and scoring. The same benchmark under two setups can give the same model scores that differ by many points, so an estimate here is not a prediction of a score reported elsewhere, for example on a model card. Estimates are blue where the model has other scores under the same setup and magenta where it has none. For a magenta estimate, ◇ marks the model's score on the same benchmark under another setup, on which the estimate is anchored. Without one, the held-out error is about twice as large, and for models unlike those the collection has evaluated it is not validated at all.
Loading the model parameters and measured scores.
Model pairs binned into deciles of distance in the full embedding.
A random sample of 4,000 held-out cells. Both axes are in standard deviations of the metric, winsorized at ±4.
Mean absolute error in points, bounded metrics. Every held-out score is estimated without any score of the model from the target collection.
Held-out error grouped by the number of other collections in which the model has scores.
Gray: error of the metric mean. Blue: error of the ensemble. The percentage is the relative change. Collections are ordered by that change; the 28 with the most held-out cells are shown.
Number of models by the number of collections in which they have scores. An estimate for a model requires at least one modelled score.
Scores, model identities, collections, benchmarks, slices and metric names are taken from the Evaluation Cards warehouse, which resolves names through the entity registry and converts scores to a canonical scale. Item-level responses are read from the EEE store directly and named the same way. One rule is added: difficulty levels of one benchmark (Fibble with 1–5 lies) are shown as subsets of it.
Scores on a 0–1 scale are logit-transformed. Positive scores spanning more than two orders of magnitude are log-transformed. Lower-is-better metrics are negated. Each metric is then standardized, with a floor on its standard deviation, and winsorized at ±4. Cost, latency, throughput and length metrics are listed but not modelled.
xmt = st ( gt(ymt) − μt ) / σt
Standardizing a metric against the models measured on it makes "average" mean something different in every collection. Each standardized score is therefore modelled as bt + αt θm: an ability θm shared by all metrics, and for each metric the score of a model of average ability and the rate at which scores rise with ability. The parameters are fitted jointly over the whole store; collections are tied together by the models they share. Abilities are shrunk toward zero, more for models with little on record, and every metric is re-expressed in ability units.
xmt ≈ bt + αt θm,x′mt = ( xmt − bt ) / αt
The residual matrix, after the ability is removed, is fitted by low-rank matrix completion (weighted ridge ALS).
x̂mtLRMC = θm + um · vt
A model gets an estimate on a metric only if it has at least five modelled scores and at least five models measured on that metric share two or more metrics with it. Without such models nothing ties the model's scores to the metric; an image classifier gets no estimate on a question-answering benchmark.
For models with item-level responses, PKPS computes distances between models from embedded responses to similar queries and embeds the models by classical MDS. A residual is estimated as the inverse-distance-weighted mean over the five nearest models that have the metric.
x̂mtPKPS = θm + Σd ∈ N5(m) wd ( x′dt − θd ),wd ∝ 1 / ‖ψm − ψd‖
Where both estimates exist they are averaged with a weight chosen by cross-validation. The 90% interval is the 0.9 quantile of absolute held-out errors in the metric's collection, on the standardized scale.
x̂mtENS = α x̂mtPKPS + (1 − α) x̂mtLRMC
As in the Evaluation Cards, two scores are the same measurement only if they share benchmark, slice and metric, and a collection is treated as one setup. If a model has the target's benchmark, slice and metric measured in another collection s, that score is moved to the target setup by the median logit difference between the two collections among the models j measured in both (at least three; otherwise it is carried over unchanged) and blended with the ensemble. The weight is chosen by cross-validation, per collection where there are enough held-out scores, and these estimates have their own intervals. This applies to bounded metrics on the same scale.
x̂mtA = zt ( ℓms + medj ( ℓjt − ℓjs ) ),x̂mt = w x̂mtA + (1 − w) x̂mtENS
The estimate and the ends of its interval are transformed back to the metric's own scale.
ŷmt = gt−1 ( μt + st σt ( bt + αt x̂mt ) )
Notation. ymt: score of model m on metric t. gt: logit, log or identity. st: −1 for lower-is-better metrics, else +1. μt, σt: mean and standard deviation of the transformed scores on t. θm: model ability. bt, αt: metric intercept and slope on ability. um, vt: model and metric factors. ψm: PKPS coordinates. ℓms = g(yms): logit score under setup s. zt: standardization of step 2 for metric t.